|
Building
& Construction Permit Requirements
- How
many sets of drawings are required?
- Two
(2) -- One (1) must be approved by the city
having jurisdiction.
- What
drawings are included in this set?
- (Civil,
Structural, Electrical, Fire Protection, Hood
Suppression, Specialized)
- A
full complete set.
- Permit
Cost?
-
Based on construction costs Residential: $10.00
for the first $5,000 and $1.00 for each $1,000
Commercial: $20.00 for the first $5,000 and
$1.50 for each $1,000
- What
code applies?
- Special
Considerations?
- (Hydrant
Spacing, Fire Flow Requirements, Special Inspections,
Knox Box, Etc...)
- Special
Inspections are noted in plan review letter.
RETURN
TO FIRE PREVENTION TIPS
|
|